Publications
Fusing 4D modelling and laser scanning for construction schedule control. Proc. of the 26th Annual Conf. Association of Researchers in Construction Management. Retrieved from https://d1wqtxts1xzle7.cloudfront.net/48932495/Bosche-2010-ARCOM.pdf?1474207991=&response-content-disposition=inline%3B+filename%3DFusing_4D_Modelling_and_Laser_Scanning_f.pdf&Expires=1618850114&Signature=P6aNtcESBsOqZHphnga9nhE6QDACMh2Tjq2kcLG7iTNIUKxIk3
. (2010). Geometric accuracy of digital twins for structural health monitoring. In Bridge Engineering. IntechOpen. Retrieved from https://scholar.google.ca/scholar?oi=bibs&cluster=8722062051834655463&btnI=1&hl=en 72444.pdf
. (2020). Graphical modeling and simulation for design and control of a tele-operated clinker clearing robot. Automation in construction, 16(1), 96-106. Retrieved from https://doi.org/10.1016/j.autcon.2005.12.002
. (2007). Health and productivity impact of semi-automated work systems in construction. Automation in Construction, 120, 103396. Retrieved from https://doi.org/10.1016/j.autcon.2020.103396
. (2020). History and renaissance of construction engineering and management in Canada. Journal of construction engineering and management, 133(9), 678-683. Retrieved from https://doi.org/10.1061/(ASCE)0733-9364(2007)133:9(678)
. (2007). How to identify the critical stakeholders in an interface management system?. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 30(1). Retrieved from https://www.semanticscholar.org/paper/How-to-Identify-the-Critical-Stakeholders-in-an-Shokri-Haas/aa27c07e116412f5c443eedfef19edb880f86398?p2df
. (2013). How to improve interface management behaviors in EPC projects: Roles of formal practices and social norms. Journal of Management in Engineering, 34(6), 04018032. Retrieved from https://doi.org/10.1061/(ASCE)ME.1943-5479.0000639 How-to-Improve-Interface-Management-Behaviors-in-EPC-Projects-Roles-of-Formal-Practices-and-Social-Norms.pdf
. (2018). A human body posture sensor for monitoring and diagnosing MSD risk factors. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 30, 1. Retrieved from https://www.researchgate.net/profile/Abdullatif-Alwasel/publication/257936855_A_Human_Body_Posture_Sensor_for_Monitoring_and_Diagnosing_MSD_Risk_Factors/links/0deec52657036daf67000000/A-Human-Body-Posture-Sensor-for-Monitoring-and-Diagnosing-MSD-Risk-Fact
. (2013). Human-Assisted Obstacle Avoidance System Using 3D Workspace Modeling for Construction Equipment Operation. ASCE J. Comp. in Civ. Engrg., Volume 20, Issue 3, pp. 177-186.
. (2006). Identifying enablers for coordination across construction supply chain processes: a systematic literature review. Engineering, Construction and Architectural Management. Retrieved from https://doi.org/10.1108/ECAM-05-2020-0299
. (2020). Identifying influential factors for capital construction project planning strategies. Canadian Society for Civil Engineering Construction Specialty Conference. Retrieved from https://www.semanticscholar.org/paper/Identifying-influential-factors-for-capital-project-Safa-MacGillivray/33bc912b3f1105dde86612480ed48e79624c0728?p2df
. (2015). Identifying poses of safe and productive masons using machine learning. Automation in Construction.
. (2017). An image-based frameworks for automated discrepancy quantification and realignment of industrial assemblies. In 5th Int. Construction Specialty Confence (pp. 0471-0479). Retrieved from https://pdfs.semanticscholar.org/d9ed/4494715eeecc79dcd512acf17cfe15d80853.pdf
. (2015). Impact of augmented reality and spatial cognition on assembly in construction. Automation in Construction, 108. Retrieved from https://doi.org/10.1016/j.autcon.2019.102935
. (2019). Impact of fast automated tracking of construction components on labor productivity. Procs 26th International Symposium on Automation and Robotics in Construction (ISARC). Retrieved from https://www.semanticscholar.org/paper/Impact-of-fast-automated-tracking-of-construction-Grau-Caldas/b47300909c7f7c2b34c66630a5acdea0cb1c3105?p2df
. (2009). The impact of management practices on mechanical construction productivity. Construction Management and Economics, 29(3), 305-316. Retrieved from https://doi.org/10.1080/01446193.2010.538070
. (2011). Impact of steel quick connection system on steel erection labor productivity: case studies and simulation based analyses. Canadian Journal of Civil Engineering, 41(12). Retrieved from https://doi.org/10.1139/cjce-2014-0079
. (2014). An implementation model for automated construction materials tracking and locating. Canadian Journal of Civil Engineering, 37(4), 588-599. Retrieved from https://doi.org/10.1139/L09-178
. (2010). An implementation model for automated construction materials tracking and locating (vol 37, pg 588, 2010). CANADIAN JOURNAL OF CIVIL ENGINEERING, 37(6), 929-929. Retrieved from https://scholar.google.ca/scholar?hl=en&as_sdt=0,5&cluster=9234848135491647709
. (2010). . (2015).