Publications

Search
Author Title [ Type(Desc)] Year
Journal Article
Golzarpoor, B. , & Haas, C. . (2015). Implementation of Construction Industry Best Practices into Workflow Management Systems. Retrieved from https://www.semanticscholar.org/paper/Implementation-of-construction-industry-best-into-Golzarpoor-Haas/c3cd6df679dea9bb5cc5847b4f1884f9b9da10dd?p2df
Safa, M. , Sabet, A. , MacGillivray, S. , Davidson, M. , Kaczmarczyk, K. , Gibson, G. E. , Rayside, D. , et al. (2015). Classification of construction projects. Retrieved from https://uwspace.uwaterloo.ca/handle/10012/11560
Safa, M. , Sabet, A. , Ghahremani, K. , Haas, C. , & Walbridge, S. . (2015). Rail corrosion forensics using 3D imaging and finite element analysis. International Journal of Rail Transportation, 3(3), 164-178. Retrieved from https://doi.org/10.1080/23248378.2015.1054622
Safa, M. , Shahi, A. , Nahangi, M. , Haas, C. , & Noori, H. . (2015). Automating measurement process to improve quality management for piping fabrication. Structures, 3, 71-80. Retrieved from https://doi.org/10.1016/j.istruc.2015.03.003
Nahangi, M. , Yeung, J. , Haas, C. T. , Walbridge, S. , & West, J. . (2015). Automated assembly discrepancy feedback using 3D imaging and forward kinematics. Automation in Construction, 56, 36-46. Retrieved from https://doi.org/10.1016/j.autcon.2015.04.005
Shahi, A. , Safa, M. , Haas, C. T. , & West, J. S. . (2015). Data fusion process management for automated construction progress estimation. Journal of Computing in Civil Engineering, 29(6). Retrieved from https://doi.org/10.1061/(ASCE)CP.1943-5487.0000436
Safa, M. , Shahi, A. , Haas, C. T. , Fiander-McCann, D. , Safa, M. , Hipel, K. , & MacGillivray, S. . (2015). Competitive intelligence (CI) for evaluation of construction contractors. Automation in Construction, 59, 149-157. Retrieved from https://doi.org/10.1016/j.autcon.2015.02.009
Yeung, J. , Walbridge, S. , & Haas, C. . (2015). The role of geometric characterization in supporting structural steel reuse decisions. Resources, conservation and recycling, 104, 120-130. Retrieved from https://doi.org/10.1016/j.resconrec.2015.08.017
Rehan, R. , Knight, M. A. , Unger, A. J. A. , & Haas, C. T. . (2014). Financially sustainable management strategies for urban wastewater collection infrastructure–development of a system dynamics model. Tunnelling and Underground Space Technology, 39, 116-129. Retrieved from https://doi.org/10.1016/j.tust.2012.12.003
Rehan, R. , Unger, A. J. A. , Knight, M. A. , & Haas, C. T. . (2014). Financially sustainable management strategies for urban wastewater collection infrastructure–Implementation of a system dynamics model. Tunnelling and Underground Space Technology, 39, 102-115. Retrieved from https://doi.org/10.1016/j.tust.2012.12.004
Yeung, J. , Nahangi, M. , Shahtaheri, Y. , Haas, C. , Walbridge, S. , & West, J. . (2014). Comparison of methods used for detecting unknown structural elements in three-dimensional point clouds. Construction Research Congress 2014: Construction in a Global Network. Retrieved from https://doi.org/10.1061/9780784413517.097
Shan, Y. , Kim, J. Yeol, Goodrum, P. M. , Caldas, C. H. , & Haas, C. . (2014). Impact of steel quick connection system on steel erection labor productivity: case studies and simulation based analyses. Canadian Journal of Civil Engineering, 41(12). Retrieved from https://doi.org/10.1139/cjce-2014-0079
Shahi, A. , Haas, C. T. , West, J. S. , & Akinci, B. . (2014). Workflow-based construction research data management and dissemination. Journal of Computing in Civil Engineering, 28(2), 244-252. Retrieved from https://doi.org/10.1061/(ASCE)CP.1943-5487.0000251
Turkan, Y. , Bosche, F. , Haas, C. T. , & Haas, R. . (2014). Tracking of secondary and temporary objects in structural concrete work. Construction Innovation. Retrieved from https://doi.org/10.1108/CI-12-2012-0063
Ahmed, M. Fouad, Haas, C. T. , & Haas, R. . (2014). Automatic detection of cylindrical objects in built facilities. Journal of computing in Civil Engineering, 28(3). Retrieved from https://doi.org/10.1061/(ASCE)CP.1943-5487.0000329
Nasir, H. , Ahmed, H. , Haas, C. , & Goodrum, P. M. . (2014). An analysis of construction productivity differences between Canada and the United States. Construction Management and Economics, 32(6), 595-607. Retrieved from https://doi.org/10.1080/01446193.2013.848995
Bosche, F. , Guillemet, A. , Turkan, Y. , Haas, C. T. , & Haas, R. . (2014). Tracking the built status of MEP works: Assessing the value of a Scan-vs-BIM system. Journal of computing in civil engineering, 28(4). Retrieved from https://doi.org/10.1061/(ASCE)CP.1943-5487.0000343
Yeung, J. , Nahangi, M. , Walbridge, S. , & Haas, C. T. . (2014). A preliminary investigation into automated identification of structural steel without a priori knowledge. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 31(1). Retrieved from https://d1wqtxts1xzle7.cloudfront.net/48932510/A_Preliminary_Investigation_into_Automat20160918-30849-8g2oiy.pdf?1474207998=&response-content-disposition=inline%3B+filename%3DA_Preliminary_Investigation_into_Automat.pdf&Expires=1618411969&Signature=XVEfnY
Safa, M. , Shahi, A. , Haas, C. T. , Safa, M. , Hipel, K. , MacGillivray, S. , & Fiander-McCann, D. . (2014). A model of construction contractor selection using competitive intelligence (CI). Retrieved from http://dspace.lincoln.ac.nz/handle/10182/6304
Nahangi, M. , & Haas, C. T. . (2014). Automated 3D compliance checking in pipe spool fabrication. Advanced Engineering Informatics, 28(4), 360-369. Retrieved from https://doi.org/10.1016/j.aei.2014.04.001

Pages