Publications

Search
Author Title Type [ Year(Desc)]
2014
Goetz, R. , Haas, C. , Haas, R. , & Stelter, M. . (2014). Method for applying powder to a printed sheet and printing press for carrying out the method. US Patent No. 8757061. Retrieved from https://patents.google.com/patent/US8757061B2/en
Bosche, F. , Guillemet, A. , Turkan, Y. , Haas, C. T. , & Haas, R. . (2014). Tracking the built status of MEP works: Assessing the value of a Scan-vs-BIM system. Journal of computing in civil engineering, 28(4). Retrieved from https://doi.org/10.1061/(ASCE)CP.1943-5487.0000343
Yeung, J. , Nahangi, M. , Walbridge, S. , & Haas, C. T. . (2014). A preliminary investigation into automated identification of structural steel without a priori knowledge. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 31(1). Retrieved from https://d1wqtxts1xzle7.cloudfront.net/48932510/A_Preliminary_Investigation_into_Automat20160918-30849-8g2oiy.pdf?1474207998=&response-content-disposition=inline%3B+filename%3DA_Preliminary_Investigation_into_Automat.pdf&Expires=1618411969&Signature=XVEfnY
Safa, M. , Shahi, A. , Haas, C. T. , Safa, M. , Hipel, K. , MacGillivray, S. , & Fiander-McCann, D. . (2014). A model of construction contractor selection using competitive intelligence (CI). Retrieved from http://dspace.lincoln.ac.nz/handle/10182/6304
Alwasel, A. A. , Abdel-Rahman, E. M. , & Haas, C. T. . (2014). A Technique to Detect Fatigue in the Lower Limbs. In International Design Engineering Technical Conferences and Computers and Information in Engineering Conference. Retrieved from https://doi.org/10.1115/DETC2014-35484
Nahangi, M. , & Haas, C. T. . (2014). Automated 3D compliance checking in pipe spool fabrication. Advanced Engineering Informatics, 28(4), 360-369. Retrieved from https://doi.org/10.1016/j.aei.2014.04.001
Liu, J. , Shahi, A. , Haas, C. T. , Goodrum, P. , & Caldas, C. H. . (2014). Validation methodologies and their impact in construction productivity research. Journal of Construction Engineering and Management, 140(10). Retrieved from https://doi.org/10.1061/(ASCE)CO.1943-7862.0000882
Safa, M. , Shahi, A. , Haas, C. T. , & Hipel, K. W. . (2014). Supplier selection process in an integrated construction materials management model. Automation in Construction, 48, 64-73. Retrieved from https://doi.org/10.1016/j.autcon.2014.08.008
Bosche, F. , Guillemet, A. , Turkan, Y. , Haas, C. T. , & Haas, R. . (2014). Tracking the built status of MEP works: Assessing the value of a Scan-vs-BIM system. Journal of Computing in Civil Engineering, 28 (4). Retrieved from https://ascelibrary.org/doi/abs/10.1061/%28ASCE%29CP.1943-5487.0000343
Nahangi, M. , & Haas, C. . (2014). Automated Form Checking for Pipe Spool Fabrication. Advanced Engineering Informatics, in press.
Shahi, A. , Haas, C. , West, J. , & Akinci, B. . (2014). Workflow-Based Construction Research Data Management and Dissemination. J. Comput. Civ. Eng., 28(2), 244–252.
2015
Bosche, F. , Ahmed, M. , Turkan, Y. , Haas, C. T. , & Haas, R. . (2015). The value of integrating Scan-to-BIM and Scan-vs-BIM techniques for construction monitoring using laser scanning and BIM: The case of cylindrical MEP components. Automation in Construction, 49, 201-213. Retrieved from https://doi.org/10.1016/j.autcon.2014.05.014
Caldas, C. H. , Kim, J. - Y. , Haas, C. T. , Goodrum, P. M. , & Zhang, D. . (2015). Method to assess the level of implementation of productivity practices on industrial projects, 141(1). Retrieved from https://doi.org/10.1061/(ASCE)CO.1943-7862.0000919
Haas, C. , Bosche, F. , & Kim, C. . (2015). ISARC 2013. In Automation in Construction (Vol. 49, pp. 175-175). Retrieved from https://doi.org/10.1016/j.autcon.2014.11.002
Nahangi, M. , Czerniawski, T. , Yeung, J. , Haas, C. T. , Walbridge, S. , & West, J. S. . (2015). An image-based frameworks for automated discrepancy quantification and realignment of industrial assemblies. In 5th Int. Construction Specialty Confence (pp. 0471-0479). Retrieved from https://pdfs.semanticscholar.org/d9ed/4494715eeecc79dcd512acf17cfe15d80853.pdf
Rehan, R. , Unger, A. , Knight, M. A. , & Haas, C. . (2015). Strategic water utility management and financial planning using a new system dynamics tool. Journal‐American Water Works Association, 107(1), E22-E36. Retrieved from https://doi.org/10.5942/jawwa.2015.107.0006
Ganjidoost, A. , Haas, C. T. , Knight, M. A. , & Unger, A. J. A. . (2015). INTEGRATED ASSET MANAGEMENT OF WATER AND WASTEWATER INFRASTRUCTURE SYSTEMS—BORROWING FROM INDUSTRY FOUNDATION CLASSES. International Construction Specialty Conference of the Canadian Society for Civil Engineering. Retrieved from https://www.researchgate.net/profile/Amin-Ganjidoost/publication/319490999_INTEGRATED_ASSET_MANAGEMENT_OF_WATER_AND_WASTEWATER_INFRASTRUCTURE_SYSTEMS-BORROWING_FROM_INDUSTRY_FOUNDATION_CLASSES/links/59aed670458515150e4738bc/INTEGRATED-ASSET-MANAGEMENT-OF-
Nahangi, M. , Chaudhary, L. , Yeung, J. , Haas, C. T. , & Walbridge, S. . (2015). Skeleton-based registration of 3D laser scans for automated quality assurance of industrial facilities. In Computing in Civil Engineering (pp. 33-40). Retrieved from https://doi.org/10.1061/9780784479247.005
Nahangi, M. , Yeung, J. , Haas, C. , Walbridge, S. , & West, J. . (2015). Robotic Kinematics Analogy for Realignment of Defective Construction Assemblies. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 32(1). Retrieved from https://www.semanticscholar.org/paper/Robotic-Kinematics-Analogy-for-Realignment-of-Nahangi-Yeung/3ae1231f4599e2465e6646b28ef6d9594fdcfee6?p2df
Fiolet, J. - C. , & Haas, C. T. . (2015). Application of prospect theory to management decisions under risk on construction projects. Retrieved from https://pdfs.semanticscholar.org/c7ab/76f6cf33de0a525cd76601c4cea07a41a386.pdf

Pages