Publications

Search
[ Author(Desc)] Title Type Year
H
Haas, C. , Bosche, F. , & Kim, C. . (2015). ISARC 2013. In Automation in Construction (Vol. 49, pp. 175-175). Retrieved from https://doi.org/10.1016/j.autcon.2014.11.002
Haas, C. . (2012). Device for powdering printed sheets in a printing press, and printing press with a powdering device. US Patent No. 13191957. Retrieved from https://patents.google.com/patent/US20120024175A1/en
Haas, R. , Martin, N. , Ehrhard, J. , Berlingen, D. , & Haas, C. . (2009). Spray nozzle and method for dusting freshly printed products. US Patent No. 7607391. Retrieved from https://patents.google.com/patent/US7607391B2/en
Haas, C. , Waugh, L. , & Froese, T. . (2007). History and renaissance of construction engineering and management in Canada. Journal of construction engineering and management, 133(9), 678-683. Retrieved from https://doi.org/10.1061/(ASCE)0733-9364(2007)133:9(678)
Hornaday, W. , Haas, C. , O'Connor, J. , & Wen, J. . (1993). Computer Aided Planning for Heavy Lifts. ASCE Journal of Construction Engineering and Management, 119(3), pp. 498-515.
Hwang, B. - G. , Thomas, S. R. , Haas, C. T. , & Caldas, C. H. . (2009). Measuring the impact of rework on construction cost performance. Journal of construction engineering and management, 135(3), 187-198. Retrieved from https://doi.org/10.1061/(ASCE)0733-9364(2009)135:3(187)
Hwang, B. G. , Thomas, S. R. , Haas, C. T. , & Caldas, C. H. . (2009). Measuring the impact of rework on construction cost performance. Journal of Construction Engineering and Management, 135 (3), pp. 187-198. Retrieved from https://ascelibrary.org/doi/abs/10.1061/%28ASCE%290733-9364%282009%29135%3A3%28187%29
Hwang, B. , Thomas, S. , Haas, C. , & Caldas, C. . (2009). Measuring the Impacts of Rework on Construction Cost Performance. ASCE Journal of Construction Engineering and Management, Vol. 135, No. 3, pp. 187-198.
J
Jeanclos, N. , Sharif, M. - M. , Li, S. Kun, Kwiatek, C. , & Haas, C. . (2018). Derivation of Minimum Required Model for Augmented Reality Based Stepwise Construction Assembly Control. In Workshop of the European Group for Intelligent Computing in Engineering (Vol. 10863, pp. 336-358). Springer, Cham. Retrieved from https://doi.org/10.1007/978-3-319-91635-4_18
Jiang, X. H. , VAZIRI, S. H. , Haas, C. , Rothenburg, L. , Kennepohl, G. , & Haas, R. . (2009). Improvements in Piezoelectric Sensors and Weigh-in-Motion Data Collection Technology. 2009 Annual Conference and Exhibition of the Transportation Association of Canada-Transportation in a Climate of Change. Retrieved from https://trid.trb.org/view/911640
Jiang, X. , Vaziri, S. H. , Haas, C. , Rothenburg, L. , Kennepohl, G. , & Haas, R. . (2009). Improvements in piezoelectric sensors and WIM data collection technology. Proceedings of the 2009 Annual Conference of the Transportation Association of Canada. Retrieved from http://conf.tac-atc.ca/english/resourcecentre/readingroom/conference/conf2009/pdf/Jiang.pdf
K
Kang, S. , & Haas, C. T. . (2018). Evaluating artificial intelligence tools for automated practice conformance checking. International Symposium on Automation and Robotics in Construction. Retrieved from https://doi.org/10.22260/isarc2018%2F0015
Kang, S. , Cho, H. , Kang, K. , Kang, M. , & Haas, C. T. . (2018). PIECE 3D: Portable Interactive Education for Construction Engineering in 3D. International Symposium on Automation and Robotics in Construction. Retrieved from https://scholar.google.ca/scholar?oi=bibs&cluster=12043666691639473230&btnI=1&hl=en
Karimidorabati, S. , Haas, C. T. , & Gray, J. . (2016). Evaluation of automation levels for construction change management. Engineering, construction and architectural management. Retrieved from https://doi.org/10.1108/ECAM-01-2015-0013
Karimidorabati, S. , Haas, C. T. , & Gray, J. . (2013). A model for implementing & continuously improving the automated change management process for construction mega projects. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 30(1). Retrieved from https://www.semanticscholar.org/paper/A-Model-for-Implementing-%26-Continuously-Improving-Karimidorabati-Haas/c1469d02555ff18336cb39de6f8d9f4f908d50a5?p2df
Kim, C. , Haas, C. , Liapi, K. , & Caldas, C. . (2006). Human-Assisted Obstacle Avoidance System Using 3D Workspace Modeling for Construction Equipment Operation. ASCE J. Comp. in Civ. Engrg., Volume 20, Issue 3, pp. 177-186.
Kim, C. , Haas, C. , & Liapi, K. . (2005). Rapid, On-Site Spatial Information Acquisition and its Use for Infrastructure Operation and Maintenance. Automation in Construction, Vol 14/5, pp.666-684.
Kim, H. , Rauch, A. F. , & Haas, C. . (2004). Automated Quality Assessment of Stone Aggregates Based on Laser Imaging and a Neural Network. ASCE Journal of Computing in Civil Engineering, vol. 18, issue 1, pp. 58-64.
Kwiatek, C. , Sharif, M. , Li, S. , Haas, C. , & Walbridge, S. . (2019). Impact of augmented reality and spatial cognition on assembly in construction. Automation in Construction, 108. Retrieved from https://doi.org/10.1016/j.autcon.2019.102935
Kwiatek, C. , Li, S. K. , Sharif, M. M. , Jeanclos, N. , Haas, C. T. , & Walbridge, S. . (2018). Facilitating the Communication of Rework Information to Craft Workers Using an Augmented Reality Process. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 35. Retrieved from https://scholar.google.ca/scholar?oi=bibs&cluster=15915907439949132890&btnI=1&hl=en Facilitating-the-Communication-of-Rework-Information-to-Craft-Workers-Using-Augmented-Reality.pdf

Pages