Publications
Automated model‐based finding of 3D objects in cluttered construction point cloud models. Computer‐Aided Civil and Infrastructure Engineering, 32(11), 893-908. Retrieved from https://doi.org/10.1111/mice.12306
. (2017). Statistical analysis of the effectiveness of management programs in improving construction labor productivity on large industrial projects. Journal of Management in Engineering, 32(1). Retrieved from https://doi.org/10.1061/(ASCE)ME.1943-5479.0000375
. (2016). Skeleton-based discrepancy feedback for automated realignment of industrial assemblies. Automation in construction, 61, 147-161. Retrieved from https://doi.org/10.1016/j.autcon.2015.10.014
. (2016). Automated removal of planar clutter from 3D point clouds for improving industrial object recognition. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 33, 1. Retrieved from https://www.semanticscholar.org/paper/Automated-Removal-of-Planar-Clutter-from-3D-Point-Czerniawski-Nahangi/48dace3eaf75d2030ebf7070bebeb899b78b16b1?p2df
. (2016). Arbitrary 3D object extraction from cluttered laser scans using local features. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 33, 1. Retrieved from https://www.semanticscholar.org/paper/Arbitrary-3D-Object-Extraction-from-Cluttered-Laser-Nahangi-Czerniawski/e4c7b6be2d9ff94bfc87cd7f7733e2a56181bdf9?p2df
. (2016). Applying the Concept of Selective Assembly to Modular Construction to Mitigate Impacts of Component Variability. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 33(1). Retrieved from https://www.semanticscholar.org/paper/Applying-the-Concept-of-Selective-Assembly-to-to-of-Rausch-Nahangi/22354b961f3f7360681b46aaa2bcb809100266f8?p2df
. (2016). Innovation in Construction Health, Safety and Environmental Research. Retrieved from https://scholar.google.ca/scholar?hl=en&as_sdt=0,5&cluster=16073874340119273326
. (2016). Interface-management process for managing risks in complex capital projects. Journal of Construction Engineering and Management, 142(2). Retrieved from https://doi.org/10.1061/(ASCE)CO.1943-7862.0000990
. (2016). Current status of interface management in construction: Drivers and effects of systematic interface management. Journal of Construction Engineering and Management, 142(2). Retrieved from https://doi.org/10.1061/(ASCE)CO.1943-7862.0001035
. (2016). Automatic realignment of defective assemblies using an inverse kinematics analogy. Journal of Computing in Civil Engineering, 30(2). Retrieved from https://doi.org/10.1061/(ASCE)CP.1943-5487.0000477
. (2016). Improving process conformance with industry foundation processes (IFP). Advanced Engineering Informatics, 30(2), 143-156. Retrieved from https://doi.org/10.1016/j.aei.2016.02.005
. (2016). Algorithm for Determining the Criticality of Documents within a Construction Information System. Journal of Computing in Civil Engineering, 30(3). Retrieved from https://scholar.google.ca/scholar?hl=en&as_sdt=0,5&cluster=14284179971133488629
. (2016). An integrated productivity-practices implementation index for planning the execution of infrastructure projects. Journal of Infrastructure Systems, 22(2). Retrieved from https://doi.org/10.1061/(ASCE)IS.1943-555X.0000275
. (2016). RESILIENT INFRASTRUCTURE. Retrieved from https://scholar.google.ca/scholar?oi=bibs&cluster=13538945475943283888&btnI=1&hl=en
. (2016). RESILIENT INFRASTRUCTURE. Retrieved from https://scholar.google.ca/scholar?hl=en&as_sdt=0,5&cluster=12188874308135879944
. (2016). Parallel systems and structural frames realignment planning and actuation strategy. Journal of Computing in Civil Engineering, 30(4). Retrieved from https://doi.org/10.1061/(ASCE)CP.1943-5487.0000545
. (2016). Optimizing contractor selection for construction packages in capital projects. Journal of Computing in Civil Engineering, 30(5). Retrieved from https://doi.org/10.1061/(ASCE)CP.1943-5487.0000555
. (2016). Evaluation of automation levels for construction change management. Engineering, construction and architectural management. Retrieved from https://doi.org/10.1108/ECAM-01-2015-0013
. (2016). Optimum assembly planning for modular construction using BIM and 3D point clouds. Modular and Offsite Construction (MOC) Summit Proceedings. Retrieved from https://doi.org/10.29173/mocs7
. (2016). Analyzing the Critical Sources of Dimensional Variability during the Lifecycle of a Steel Framed Modular Construction Project. Modular and Offsite Construction (MOC) Summit Proceedings.
. (2016).