Friday, July 16, 2021 — 9:00 AM to Tuesday, July 20, 2021 — 6:00 AM EDT

Plant Operations is tentatively planning an electrical shutdown that will affect QNC on July 17th for 12-14 hours. There will be no access to the building until work is complete. The QNC generator will provide power to everything connected to the backup system during the shutdown.

The following QNC services will be down for the duration of the shutdown:

  • RO/DI water
  • CDA – clean dry air (lab compressed air)
  • House vacuum system

Some time will be required after the power shutdown to successfully put the cleanroom tools back online.  We anticipate a resumption of lab activities around 6:00AM on Tuesday July 20th.

Location 
QNC - Quantum Nano Centre

200 University Avenue West

Waterloo, ON N2L 3G1
Canada

S M T W T F S
28
29
30
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
1
  1. 2024 (1)
    1. January (1)
  2. 2022 (2)
  3. 2021 (2)